| |
 |
|
Selection of the right design team is an essential element to project success. We identify potential design firms that offer the talent, interest, and depth of service required by the specific project. We develop the Request for Qualifications (RFQ) and include a Standard of Deliverables using recognized industry standards.
The Boyken Project Manager typically performs the following Pre Design/Program Phase procedures:
- Creates the project management plan
- Creates a project directory
- Develops and verifies facility requirements
- Conducts a local construction market survey
- Establishes, with the client’s prior approval, contact with the appropriate governmental authorities to determine the regulatory requirements applicable to the project
- Assists and supervises preparation of the program budget, including input from all consultants
- Develops the preliminary project master schedule
- In coordination with the client, conducts a project kickoff meeting and team orientation
- Establishes the project cost budget process
- Prepares detailed monthly reports
|
|