Commissioning Services - Equipment Start-up Services and Documentation  
The pre-occupancy period is one of the most critical times in the life of a new building. Time and effort spent reviewing designs and installation, testing systems and equipment, preparing and collecting documentation, bidding contracts, preparing budgets and management plans, and developing emergency procedures will greatly reduce costs and improve reliability and building comfort and safety. It is imperative that this work be completed before the contractors leave the job and before the building is subject to the demands of occupancy.
 
The project commissioning process provides the foundation for proper building start-up and creates a long-term value enhancement for the occupants. Overall, the success of a construction project can only be judged after a building is assembled and prepared for occupancy. The proper use of Boyken International’ quality assurance measures can dramatically reduce post-opening problems and can assist in the completion of a successful project.